Edgewater · Miami
Edition Residences Edgewater — 55 Stories at 2121 N Bayshore Drive
The Edition Residences Edgewater is a 55-story residential tower proposed for 2121 North Bayshore Drive in Edgewater, developed by Two Roads Development and designed by Arquitectonica. Developer pricing has been released on 185 residences plus three tri-level penthouses, but as of October 2026 the project has not yet broken ground: a multi-year dispute over site control was resolved in September 2026, and the construction timeline is being set from that point.
| Address | 2121 N Bayshore Drive, Miami, FL 33137 |
| Developer | Two Roads Development |
| Architect | Arquitectonica |
| Stories | 55 |
| Residences | 185 + 3 penthouses (188 total) |
| Height | 649 ft |
| Frontage | Biscayne Bay |
| Market | Edgewater |
| Status | Not yet under construction |
| Anticipated delivery | Not yet confirmed (see timeline below) |
| Developer pricing from | $1,955,000 (pre-sales; not resale) |
Developer and architect
Two Roads Development is the developer on record. The company is Miami-based and has delivered projects elsewhere in Florida and the Caribbean. The EDITION brand is a Marriott International hotel brand co-developed with Ian Schrager; here it licenses the brand to a residential tower rather than operating a hotel. The name on the door does not obligate Marriott to manage the building or its residences, and the recorded condominium declaration — not the branding agreement — will govern what buyers actually own and how the association runs.
The architect of record is Arquitectonica, which has designed a significant share of Edgewater's tower stock, including other bayfront buildings along North Bayshore Drive. The firm's track record here is legible from the street. What Arquitectonica delivers for any given project, however, is set in the contract between the developer and the firm, and finish specifications in pre-construction materials are not guarantees.
The litigation and what it means for the timeline
The site at 2121 North Bayshore Drive was the subject of multi-year litigation over property ownership. According to a September 2026 report in the World Red Eye, Two Roads Development resolved that dispute and gained complete control of the site at that time. As of October 2, 2026, no vertical construction has begun.
The project's original pre-sales materials, published starting in 2023, cited an estimated delivery of 2026 — based on a Summer 2023 construction start and a 36-month build window. That timeline did not materialize. A realistic delivery estimate now, starting construction from late 2026 or early 2027, puts occupancy somewhere in 2029 or later, depending on permitting, financing and construction pace. The developer has not published a revised timeline as of this writing, and no date on this page should be taken as a commitment.
The practical consequence for buyers: pre-sales contracts on projects with unresolved construction timelines carry risks that completed-building purchases do not. Deposit money is held in escrow under Florida Statute 718.202, but construction delays and rescission rights under that statute are worth reviewing with a real estate attorney before you sign.
The residences
Developer materials describe 185 standard residences and three tri-level penthouses, for 188 units total. Floor plans run from one bedroom plus den to four bedrooms, with living areas between 1,952 and 3,864 square feet. Each residence is described as having semi-private elevator access.
Developer pricing as of pre-sales launch:
- One bedroom + den: from $1,955,000
- Two bedrooms + den: from $2,800,000
- Three bedrooms: from $2,995,000
- Four bedrooms: from $7,920,000
- Penthouses: pricing not publicly released
These are developer pre-sales prices, not resale figures. No resale transactions have been recorded for this building because no units have closed. The MLS shows no resale activity as of October 2026. Pre-sales pricing at a pre-construction project is not a reliable indicator of resale value at delivery, and a 36-month-plus construction window means market conditions at close will differ from those at contract.
Amenities
Developer materials describe approximately 45,000 square feet of indoor and outdoor amenity space. Specified elements include a rooftop pool and hot tub, a multi-sport simulator, six guest suites, a fitness center, a yoga studio, a spa, a private dining room, a cinema, a concierge service, and valet parking. An on-site restaurant is listed. The three penthouses are described as having private rooftop gardens and individual pools.
Amenity descriptions in pre-construction marketing are developer representations, not contractual obligations unless incorporated into the purchase agreement. Buyers should confirm which elements are specified in their contract and understand that scope and finishes can change between approval and delivery.
Lease terms
Minimum lease term and the number of leases permitted per year are set in the condominium declaration, which has not yet been recorded for this project. Developer sales materials reviewed for this page do not specify lease restrictions. If a rental strategy is part of your rationale for purchase, confirm the terms with the developer in writing before contracting and verify that those terms appear in the declaration when it is recorded.
What to weigh carefully
No recorded declaration yet. The governing documents, including lease restrictions, pet policies, reserve funding requirements, and assessment procedures, are not yet public record. Review the draft declaration with your attorney before signing a purchase contract.
Litigation history on the site. The dispute over site control was resolved in September 2026. Understand the full history of that litigation and confirm the title is clean before proceeding.
Construction timeline is uncommitted. The developer has not published a revised delivery date since the litigation was resolved. Any date you see in marketing materials reflects the original 2023 estimate. Escrow deposit protections under Florida law exist, but they do not guarantee delivery or cover the opportunity cost of committed capital over a multi-year wait.
Pre-construction pricing is not a price discovery mechanism. Developer pricing at launch is set before construction, before market conditions at delivery are known, and before final specifications are confirmed. It is not the same as a comparable sale.
Landmark inspection schedule. Because the building has not yet been completed, it will not enter the Miami-Dade milestone inspection cycle (required at 25 years and every 10 years after that for buildings of three or more stories within three miles of the coast) until the mid-2050s at the earliest. Florida's structural integrity reserve study requirement, under House Bill 913, will apply once the building is delivered. Buyers should understand that a brand-new building is not exempt from future reserve obligations.
Frequently asked questions
Who is the developer of Edition Residences Edgewater?
Two Roads Development. The EDITION brand is licensed from Marriott International, which co-developed the brand with Ian Schrager. The branding agreement does not give Marriott operational control of the residential association.
Who designed Edition Residences Edgewater?
Arquitectonica is the architect of record. The firm has designed multiple buildings along North Bayshore Drive in Edgewater.
How many units are in Edition Residences Edgewater?
Developer materials describe 185 standard residences plus three tri-level penthouses, for 188 total. The Miami-Dade Property Appraiser's roll will show the recorded folio count once the declaration is filed and individual units are assessed.
When will Edition Residences Edgewater be completed?
The original pre-sales estimate was 2026. That timeline was not met due to multi-year litigation over site control, which resolved in September 2026. A revised delivery date has not been published by the developer as of October 2026. A 36-month build window from a 2027 construction start would put delivery around 2029–2030.
What are the lease restrictions at Edition Residences Edgewater?
The condominium declaration has not been recorded. Lease terms, minimum rental periods, and the number of leases permitted per year will be set in that document. Developer marketing materials reviewed for this page do not specify restrictions. Confirm in writing with the developer before contracting.
Is Edition Residences Edgewater on the water?
The site at 2121 North Bayshore Drive is on Biscayne Bay in Edgewater. Developer materials describe waterfront positioning. The specific frontage treatment and Baywalk easements will be set in recorded permits and site plans.
Are the pre-sales prices at Edition Residences market prices?
Developer pre-sales prices are not the same as resale market prices. No resale transactions have been recorded for this building. The pre-sales price reflects the developer's program as of launch, not what a buyer might achieve reselling at delivery.
Working with this building
I track pre-construction projects in Edgewater so I can give you an accurate read on what each building represents before you sign. For Edition Residences Edgewater, that means watching the permit record and the developer's revised construction timeline as they become available. If you are weighing this tower against a completed Edgewater building, I can pull the folio data, recorded sale history, and association documents on the alternative before you decide. Reach out through the contact page.
Stefania Riverin, Licensed Real Estate Sales Associate · FL SL3620067 · Brokered by NB Elite Realty · 1101 Brickell Ave, Miami, FL 33131 · Equal Housing Opportunity
Sources: Florida YIMBY, April 2023; World Red Eye, September 2026; Josh Stein Realtor pre-sales summary; Miami-Dade Property Appraiser folio search, accessed October 2, 2026.
Other Edgewater building guides
See the full Edgewater context in the Edgewater neighborhood guide, or browse individual towers: Elysee Miami at 788 NE 23rd Street, Gran Paraiso at 480 NE 31st Street. The full index is at Miami condo buildings.
On the market
What is for sale in Edition Residences Edgewater today
Live from the Miami MLS. Asking prices only — what units in this building have actually sold for is the section directly below, and it comes from the county roll rather than from a listing.
For sale
| Unit | Asking | Bd / Ba | Sq ft | Days | Listing courtesy of |
|---|
Nothing is listed for sale in this building right now.
For rent
| Unit | Rent | Bd / Ba | Sq ft | Days | Listing courtesy of |
|---|
Nothing is listed for rent in this building right now.
Copyright Southeast Florida Multiple Listing Service © 2026. Accuracy of listing information is not guaranteed. Listing information is provided for personal consumer, non-commercial use, solely to identify potential properties for potential purchase. All other use is strictly prohibited, is a violation of the terms of use, and may violate federal and state law.
Tell me when a unit comes up in Edition Residences Edgewater
Edition Residences Edgewater — any unit for sale
Stefania watches this search and writes to you herself when something is worth your time. This site will not send you automated alerts — no daily digest, no drip.
Not yet on the county roll
Where Edition Residences Edgewater actually stands
There is no sale history to publish for this building, because the county records condominium sales only once a declaration exists. Until then the only available facts come from the developer and from people watching the site. Here is who said what, and when.
- Construction
- Not under construction. Two Roads Development reached and fully funded a settlement with the remaining owners of Biscayne 21 at the site, ending multi-year litigation and giving the developer full control of the parcel. No permit, demolition or vertical work is reported.Reported 4 September 2026 by World Red Eye.
- Completion
- Not published by the developer
Where the published dates disagree
Pre-sales materials from 2023 gave delivery as 2026, on a summer 2023 construction start and a 36-month build. The site was still in litigation three years after that. Listing material continues to describe the tower as under construction; as of September 2026 nothing had been built, and the developer has published no revised date. A buyer comparing this against a completed Edgewater building is comparing a dated marketing estimate with a recorded sale history.
Source: World Red Eye — site litigation settled, September 2026, World Red Eye. Nothing on this panel is a county record, and none of it is a commitment by anyone. A delivery date on a tower under construction is a forecast — ask for it in writing before it matters to you.

Work with Stefania
Thinking about Edition Residences Edgewater?
Stefania can tell you what is actually available, what the fee covers, and where the building stands on its inspection and reserves.
Got it — that reached Stefania directly.
She answers inquiries personally, usually the same day. If it is urgent, call(786) 828-0091.